Tape-out Guidelines
Please select the chip type:
Contact: Ms. Fang-Ling Hsu Tel: 03-5773693 ext. 7123 Email:fanglin@narlabs.org.tw
Note: The applicant must download the declaration file, fill it out with relevant information, sign, and then email a scanned copy of this document to the TSRI.
Contact: Ms. Fang-Ling Hsu Tel: 03-5773693 ext. 7123 Email:fanglin@narlabs.org.tw
Step1 > Applicant must legally use process information. Please select one chip type for tape-out
- Seek TSRI approval for the use of process information
- Provide a “Declaration of Legal Use of Process Information for Chip Manufacturing”
Step2 > Please carefully read the following documents prior to application
No. | Document Name | File Downloading | |
---|---|---|---|
1 | Guidance Notes and Instructions on Application for the Full-price Chip Service | Download | |
2 | Terms and Conditions for Full-price Chip Manufacturing | Download | |
3 | Chip Tape-out Schedule | 2025 | Download |
2024 | Download | ||
4 | Notes on Tape-Out Application | Download | |
5 |
Explanation of the DRC Violation for Each Process (If there are DRC errors in the layout, please click this link to verify them) |
Download |
Step3 > Please log in to the TSRI’s website → Chip Implementation → Tape-out Application → Tape-out New Application to complete the following process prior to the application deadline
No. | Process Item | File Downloading | ||
---|---|---|---|---|
1 | Fill out and submit a Full-price Chip Manufacturing Application Form | (Please go to the System to complete the form or upload the file) | ||
2 | Send the files | GDS file | (Please go to the System to complete the form or upload the file) | |
Design information (only the chip layout diagram or wire bonding diagram is needed) | Wire bonding diagram sample | Download | ||
Wire bonding diagram example | Download | |||
DRC result (not required for WIN processes such as P15 and GaN12 processes) | (Please go to the System to complete the form or upload the file) | |||
TRF document (only required for cell-base design projects) | Cell-base Form | Download | ||
Cell-base example
|
Download |
Appendix: Related Documents and Information
Please send the following documents and information by email to fanglin@narlabs.org.tw , based on the project’s needsNo. | Document Name | File Downloading | |
---|---|---|---|
1 | Declaration of Legal Use of Process Information for Chip Manufacturing* Note | Download | |
2 | Sawing Layout for Full-price Chip Manufacturing | Notes | Download |
Example | Download | ||
3 | Instructions on Application for Full-price Chip Service Changes | Example | Download |